Substation Scout

Columbia & Garfield, WA interconnection queue

4 active projects totalling 750 MW in the BPA queue.

4active projects
750active MW
4total filed
Queue IDProjectkVMWResourceStatus
G0286 Tucannon River Wind Farm n/r 250 Wind ENERGIZED
G0294 Not reported n/r 250 Wind IA EXECUTED
G0295 Not reported n/r 250 Wind IA EXECUTED
G1086 Not reported n/r 0 Solar STUDY

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.