Substation Scout

Columbia, WA interconnection queue

4 active projects totalling 407 MW in the BPA queue, plus 4 with terminal status (shown greyed).

4active projects
407active MW
8total filed
Queue IDProjectkVMWResourceStatus
G0298 Not reported 500 300 Wind WITHDRAWN
G0299 Not reported 500 300 Wind WITHDRAWN
G77 300MW Lower Monumental-Starbuck 500 300 Wind WITHDRAWN
G0284 Lower Snake Phase 1 n/r 250 Wind ENERGIZED
G100 Hopkins Ridge Wind 115 150 Wind ENERGIZED
G0274 Hopkins Ridge Addition n/r 7 Wind ENERGIZED
G0847 Not reported 230 0 Solar E&P EXECUTED
G1070 Not reported 115 0 Solar WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.