4 active projects totalling 407 MW in the BPA queue, plus 4 with terminal status (shown greyed).
4active projects
407active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G0298 | Not reported | 500 | 300 | Wind | WITHDRAWN |
| G0299 | Not reported | 500 | 300 | Wind | WITHDRAWN |
| G77 | 300MW Lower Monumental-Starbuck | 500 | 300 | Wind | WITHDRAWN |
| G0284 | Lower Snake Phase 1 | n/r | 250 | Wind | ENERGIZED |
| G100 | Hopkins Ridge Wind | 115 | 150 | Wind | ENERGIZED |
| G0274 | Hopkins Ridge Addition | n/r | 7 | Wind | ENERGIZED |
| G0847 | Not reported | 230 | 0 | Solar | E&P EXECUTED |
| G1070 | Not reported | 115 | 0 | Solar | WITHDRAWN |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.