Garfield, WA interconnection queue
0 active projects totalling 0 MW in the BPA queue, plus 14 with terminal status (shown greyed).
0active projects
0active MW
14total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G0624 | Not reported | n/r | 3,813 | Solar | WITHDRAWN |
| G0730 | Not reported | n/r | 1,125 | Wind | WITHDRAWN |
| G0665 | Not reported | 500 | 750 | Wind | WITHDRAWN |
| G0324 | Not reported | 115 | 300 | Wind | WITHDRAWN |
| G0824 | Not reported | 500 | 300 | Solar | WITHDRAWN |
| G0872 | Not reported | n/r | 300 | Wind | WITHDRAWN |
| G101 | NextEra Energy Resources | 500 | 300 | Wind | WITHDRAWN |
| G0603 | Not reported | n/r | 275 | Solar | WITHDRAWN |
| G0328 | Not reported | n/r | 252 | Wind | WITHDRAWN |
| G0329 | Not reported | n/r | 252 | Wind | WITHDRAWN |
| G85 | Windy Ridge Wind Farm | n/r | 150 | Wind | WITHDRAWN |
| G0330 | Not reported | n/r | 116 | Wind | WITHDRAWN |
| G0386 | Not reported | n/r | 20 | Wind | WITHDRAWN |
| G0727 | Not reported | 230 | 0 | Wind | WITHDRAWN |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.