Allen Junction substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).

3 PJM queue filings name Allen Junction as the point of interconnection, all in OH.

Target commercial operation dates as filed run from Dec 2010 to Jun 2023 (3 filings).

Transmission owner as filed: ATSI (1 filing).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG1-199 Allen Junction 345 kV 345 300 Battery Withdrawn Jun 2023
AG2-223 Allen Junction 345 kV 345 100 Battery Withdrawn Jun 2023
W3-059C_AT8 Allen Junction 138kV 138 12.9 Wind Withdrawn Dec 2010

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Allen Junction Substation (ATSI, 4 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Other PJM queue substations in Lucas County, OH

All 11 PJM queue filings in Lucas County, OH.

Other PJM queue substations in Fulton County, OH

All 13 PJM queue filings in Fulton County, OH.