Allen Junction substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AG1-199 Allen Junction 345 kV 345 300 Battery Withdrawn
AG2-223 Allen Junction 345 kV 345 100 Battery Withdrawn
W3-059C_AT8 Allen Junction 138kV 138 12.9 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.