Substation Scout

Wurno substation interconnection queue

1 active project totalling 6 MW in the PJM queue, plus 3 with terminal status (shown greyed).

1active projects
6active MW
4total filed
Queue IDProjectkVMWResourceStatus
AD2-178 Blackbird Solar 138 72 Solar Withdrawn
X2-040 Wurno 34.5kV 34.5 6 Gas Withdrawn
Y1-049 New River Resource Authority Waste Management Facility IRD LEG-E 34.5 6 Gas In Service
AG2-273 Wurno 138 kV 138 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.