Wurno substation interconnection queue
1 active project totalling 6 MW in the PJM queue, plus 3 with terminal status (shown greyed).
1active projects
6active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AD2-178 | Blackbird Solar | 138 | 72 | Solar | Withdrawn |
| X2-040 | Wurno 34.5kV | 34.5 | 6 | Gas | Withdrawn |
| Y1-049 | New River Resource Authority Waste Management Facility IRD LEG-E | 34.5 | 6 | Gas | In Service |
| AG2-273 | Wurno 138 kV | 138 | 0 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.