Page-Bethel substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Page-Bethel as the point of interconnection, all in VA.
Target commercial operation dates as filed run from Jun 2022 to Dec 2023 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AD1-083 | Cape Solar | 138 | 60.1 | Solar | Withdrawn | Dec 2023 |
| AG2-145 | Page-Bethel 138 kV | 138 | 0 | Hybrid | Withdrawn | Jun 2022 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Page County, VA
No other substation in Page County, VA is named as a point of interconnection in the PJM queue.
Other PJM queue substations in Pulaski County, VA
- Claytor: 2 active, 56.1 MW of 2 filed
- Wurno: 1 active, 6 MW of 4 filed
- Hickman-River Bend: none active of 3 filed