Substation Scout

Page-Bethel substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Page-Bethel as the point of interconnection, all in VA.

Target commercial operation dates as filed run from Jun 2022 to Dec 2023 (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AD1-083 Cape Solar 138 60.1 Solar Withdrawn Dec 2023
AG2-145 Page-Bethel 138 kV 138 0 Hybrid Withdrawn Jun 2022

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Page County, VA

No other substation in Page County, VA is named as a point of interconnection in the PJM queue.

All 2 PJM queue filings in Page County, VA.

Other PJM queue substations in Pulaski County, VA

All 27 PJM queue filings in Pulaski County, VA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first