Claytor substation interconnection queue

2 active projects totalling 56.1 MW in the PJM queue.

2active projects
56.1active MW
2total filed
Queue IDProjectkVMWResourceStatus
AH1-269 Claytor 138 kV 138 50 Battery Active
C01-1663 Claytor 138 kV 138 6.1 Hydro Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.