New River Resource Authority Waste Management Facility IRD LEG-E

PJM queue ID Y1-049

New River Resource Authority Waste Management Facility IRD LEG-E (Y1-049) is listed in the PJM interconnection queue as a 6 MW gas project in Pulaski County, VA. The filing names Wurno as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of March 31, 2013.

Queue IDY1-049
Project nameNew River Resource Authority Waste Management Facility IRD LEG-E
Status (as published)In Service
SubstationWurno
Point of interconnectionWurno 34.5kV
CountyPulaski
StateVA
Voltage34.5 kV
Capacity6 MW
Resource (as published)Methane
Resource categoryGas (normalized for filtering)
Target commercial operation2013-03-31
Source datasetserial

Same substation and county

Wurno substation: 4 requests in the PJM queue, 1 active totaling 6 MW.

Queue IDProjectMWResourceStatus
AD2-178Blackbird Solar72SolarWithdrawn
X2-040Wurno 34.5kV6GasWithdrawn
AG2-273Wurno 138 kV0BatteryWithdrawn

Pulaski, VA: 27 requests in the PJM queue, 4 active totaling 152.1 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy6
MW capacity6
MFO6

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first