New River Resource Authority Waste Management Facility IRD LEG-E
PJM queue ID Y1-049
New River Resource Authority Waste Management Facility IRD LEG-E (Y1-049) is listed in the PJM interconnection queue as a 6 MW gas project in Pulaski County, VA. The filing names Wurno as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of March 31, 2013.
| Queue ID | Y1-049 |
|---|---|
| Project name | New River Resource Authority Waste Management Facility IRD LEG-E |
| Status (as published) | In Service |
| Substation | Wurno |
| Point of interconnection | Wurno 34.5kV |
| County | Pulaski |
| State | VA |
| Voltage | 34.5 kV |
| Capacity | 6 MW |
| Resource (as published) | Methane |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2013-03-31 |
| Source dataset | serial |
Same substation and county
Wurno substation: 4 requests in the PJM queue, 1 active totaling 6 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AD2-178 | Blackbird Solar | 72 | Solar | Withdrawn |
| X2-040 | Wurno 34.5kV | 6 | Gas | Withdrawn |
| AG2-273 | Wurno 138 kV | 0 | Battery | Withdrawn |
Pulaski, VA: 27 requests in the PJM queue, 4 active totaling 152.1 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 6 |
| MW capacity | 6 |
| MFO | 6 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.