Hickman-River Bend substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AG1-091 Hickman-River Bend 69 kV 69 32.4 Solar Withdrawn
AF2-220 Hickman-River Bend 69 kV 69 22.2 Solar Withdrawn
AG1-092 Hickman-River Bend 69 kV 69 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.