WinFall-Chowan substation interconnection queue
1 active project totaling 24.5 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name WinFall-Chowan as the point of interconnection, all in NC.
Target commercial operation dates as filed run from May 2024 to Mar 2025 (2 filings).
1active projects
24.5active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AI2-223 | WinFall-Chowan 230kV | 230 | 56.4 | Wind | Withdrawn | May 2024 |
| Z1-036 | Timbermill Wind Farm | 230 | 24.5 | Wind | In Service | Mar 2025 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Chowan County, NC
No other substation in Chowan County, NC is named as a point of interconnection in the PJM queue.
Other PJM queue substations in Perquimans County, NC
- South Hertford: none active of 3 filed
- Swamp: none active of 3 filed