WinFall-Chowan substation interconnection queue

1 active project totalling 24.5 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
24.5active MW
2total filed
Queue IDProjectkVMWResourceStatus
AI2-223 WinFall-Chowan 230kV 230 56.4 Wind Withdrawn
Z1-036 Timbermill Wind Farm 230 24.5 Wind In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.