Swamp substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AE2-147 Swamp 230 kV 230 90 Solar Withdrawn
AF1-152 Swamp 230 kV 230 30 Solar Withdrawn
AF2-136 Swamp 230 kV 230 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.