Swamp substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE2-147 | Swamp 230 kV | 230 | 90 | Solar | Withdrawn |
| AF1-152 | Swamp 230 kV | 230 | 30 | Solar | Withdrawn |
| AF2-136 | Swamp 230 kV | 230 | 0 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.