Timbermill Wind Farm (Z1-036) is listed in the PJM interconnection queue as a 24.5 MW wind project in Perquimans County, NC. The filing names WinFall-Chowan as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of March 31, 2025.

Queue IDZ1-036
Project nameTimbermill Wind Farm
Status (as published)In Service
SubstationWinFall-Chowan
Point of interconnectionWinFall-Chowan 230kV
CountyPerquimans
StateNC
Voltage230 kV
Capacity24.5 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2025-03-31
Source datasetserial

Same substation and county

WinFall-Chowan substation: 2 requests in the PJM queue, 1 active totaling 24.5 MW.

Queue IDProjectMWResourceStatus
AI2-223WinFall-Chowan 230kV56.4WindWithdrawn

Perquimans, NC: 8 requests in the PJM queue, 1 active totaling 24.5 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy185.6
MW capacity24.5
MFO185.6

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first