Chowan, NC interconnection queue
1 active project totalling 56.4 MW in the PJM queue, plus 3 with terminal status (shown greyed).
1active projects
56.4active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI1-135 | Perquimans 230 kV | 230 | 300 | Hybrid | Withdrawn |
| AI2-223 | WinFall-Chowan 230kV | 230 | 56.4 | Wind | Withdrawn |
| C01-1764 | Pembroke Creek 230 kV | 230 | 56.4 | Wind | Active |
| AA2-059 | Edenton Solar | 15 | 6.8 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.