Miami Fort substation interconnection queue

1 active project totalling 37 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
37active MW
3total filed
Queue IDProjectkVMWResourceStatus
C01-1866 Miami Fort 345 kV 345 37 Gas Active
U1-033 Miami Fort 345kV 345 4 Coal Withdrawn
U1-034 Miami Fort 345kV 345 4 Coal Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.