Miami Fort substation interconnection queue

1 active project totaling 37 MW in the PJM queue, plus 2 with terminal status (shown grayed).

3 PJM queue filings name Miami Fort as the point of interconnection, all in Hamilton County, OH.

Target commercial operation dates as filed run from Feb 2008 to Jun 2028 (3 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: DEOK (1 filing).

1active projects
37active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-1866 Miami Fort 345 kV 345 37 Gas Active Jun 2028
U1-033 Miami Fort 345kV 345 4 Coal Withdrawn Feb 2008
U1-034 Miami Fort 345kV 345 4 Coal Withdrawn Feb 2008

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Miami Fort (DEOK, 8 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Other PJM queue substations in Hamilton County, OH

All 7 PJM queue filings in Hamilton County, OH.