Substation Scout

Willey Energy Storage Project

PJM queue ID Z1-065

Willey Energy Storage Project (Z1-065) is listed in the PJM interconnection queue as a battery request filed at 0 MW (a net change or energy-only filing) in Hamilton County, OH. The filing names Wiley as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of November 30, 2015.

Queue IDZ1-065
Project nameWilley Energy Storage Project
Status (as published)In Service
SubstationWiley
Point of interconnectionWiley 34.5kV
CountyHamilton
StateOH
Voltage34.5 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2015-11-30
Source datasetserial

Same substation and county

Wiley substation: 2 requests in the PJM queue, 1 active totaling 0 MW.

Queue IDProjectMWResourceStatus
AD2-146Wiley 138 kV42SolarWithdrawn

Hamilton, OH: 7 requests in the PJM queue, 4 active totaling 227 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy6
MW capacity0
MFO6

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first