Willey Energy Storage Project
PJM queue ID Z1-065
Willey Energy Storage Project (Z1-065) is listed in the PJM interconnection queue as a battery request filed at 0 MW (a net change or energy-only filing) in Hamilton County, OH. The filing names Wiley as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of November 30, 2015.
| Queue ID | Z1-065 |
|---|---|
| Project name | Willey Energy Storage Project |
| Status (as published) | In Service |
| Substation | Wiley |
| Point of interconnection | Wiley 34.5kV |
| County | Hamilton |
| State | OH |
| Voltage | 34.5 kV |
| Capacity | 0 MW (0 MW as filed — net change or energy-only) |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2015-11-30 |
| Source dataset | serial |
Same substation and county
Wiley substation: 2 requests in the PJM queue, 1 active totaling 0 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AD2-146 | Wiley 138 kV | 42 | Solar | Withdrawn |
Hamilton, OH: 7 requests in the PJM queue, 4 active totaling 227 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 6 |
| MW capacity | 0 |
| MFO | 6 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.