Oak Solar
PJM queue ID AB1-132
Oak Solar (AB1-132) is listed in the PJM interconnection queue as a 84 MW solar project in Northhampton County, NC. The filing names Thelma as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 25, 2023.
| Queue ID | AB1-132 |
|---|---|
| Project name | Oak Solar |
| Status (as published) | In Service |
| Substation | Thelma |
| Point of interconnection | Thelma 230kV |
| County | Northhampton |
| State | NC |
| Voltage | 230 kV |
| Capacity | 84 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2023-12-25 |
| Source dataset | serial |
Same substation and county
Thelma substation: 4 requests in the PJM queue, 2 active totaling 207.7 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AC1-086 | Cherry Solar | 123.7 | Solar | Partially in Service - Under Construction |
| AG1-106 | Oak Solar | 16 | Solar | Withdrawn |
| AG2-237 | Thelma 230kV | 0 | Battery | Withdrawn |
Northhampton, NC: 18 requests in the PJM queue, 5 active totaling 313.4 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 120 |
| MW capacity | 84 |
| MFO | 120 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.