Oak Solar

PJM queue ID AB1-132

Oak Solar (AB1-132) is listed in the PJM interconnection queue as a 84 MW solar project in Northhampton County, NC. The filing names Thelma as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 25, 2023.

Queue IDAB1-132
Project nameOak Solar
Status (as published)In Service
SubstationThelma
Point of interconnectionThelma 230kV
CountyNorthhampton
StateNC
Voltage230 kV
Capacity84 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2023-12-25
Source datasetserial

Same substation and county

Thelma substation: 4 requests in the PJM queue, 2 active totaling 207.7 MW.

Queue IDProjectMWResourceStatus
AC1-086Cherry Solar123.7SolarPartially in Service - Under Construction
AG1-106Oak Solar16SolarWithdrawn
AG2-237Thelma 230kV0BatteryWithdrawn

Northhampton, NC: 18 requests in the PJM queue, 5 active totaling 313.4 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy120
MW capacity84
MFO120

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.