Pasquotank, NC interconnection queue
3 active projects totalling 48.6 MW in the PJM queue, plus 2 with terminal status (shown greyed).
3active projects
48.6active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF1-152 | Swamp 230 kV | 230 | 30 | Solar | Withdrawn |
| W1-029 | Desert Wind Farm | 230 | 27 | Wind | In Service |
| Z2-027 | Elizabeth City Solar Park | 34.5 | 14 | Solar | In Service |
| Y1-086 | Morgan's Corner Solar | n/r | 7.6 | Solar | In Service |
| AI2-300 | Elizabeth City 34.5 kV | 34.5 | 6.4 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.