Substation Scout

Summer Shade - Green County substation interconnection queue

1 active project totalling 36 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
36active MW
2total filed
Queue IDProjectkVMWResourceStatus
AH1-083 Summer Shade - Green County 161 kV 161 60 Solar Withdrawn
AF1-050 Horseshoe Bend Solar 161 36 Solar Under Construction

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.