Horseshoe Bend Solar
PJM queue ID AF1-050
Horseshoe Bend Solar (AF1-050) is listed in the PJM interconnection queue as a 36 MW solar project in Green County, KY. The filing names Summer Shade - Green County as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of November 30, 2026.
| Queue ID | AF1-050 |
|---|---|
| Project name | Horseshoe Bend Solar |
| Status (as published) | Under Construction |
| Substation | Summer Shade - Green County |
| Point of interconnection | Summer Shade - Green County 161 kV |
| County | Green |
| State | KY |
| Voltage | 161 kV |
| Capacity | 36 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2026-11-30 |
| Source dataset | serial |
Same substation and county
Summer Shade - Green County substation: 2 requests in the PJM queue, 1 active totaling 36 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AH1-083 | Summer Shade - Green County 161 kV | 60 | Solar | Withdrawn |
Green, KY: 6 requests in the PJM queue, 3 active totaling 177 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 60 |
| MW capacity | 36 |
| MFO | 60 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.