Green, KY interconnection queue

3 active projects totalling 177 MW in the PJM queue, plus 3 with terminal status (shown greyed).

3active projects
177active MW
6total filed
Queue IDProjectkVMWResourceStatus
AH1-751 Not reported n/r 150 Battery Withdrawn
AG1-354 Exie Solar 161 90 Solar EP
C01-1216 Magnolia - Summersville 69 kV 69 51 Solar Active
AI1-165 Magnolia - Summersville 69 kV 69 50 Hybrid Withdrawn
AG2-670 Greensburg 69 kV 69 45 Solar Withdrawn
AF1-050 Horseshoe Bend Solar 161 36 Solar Under Construction

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.