Substation Scout

Summer Shade substation interconnection queue

1 active project totaling 63.6 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name Summer Shade as the point of interconnection, all in Metcalfe County, KY.

Target commercial operation dates as filed run from Jun 2024 to Dec 2029 (2 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: EKPC (1 filing).

1active projects
63.6active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG2-684 Summer Shade 161 kV 161 198.6 Solar Withdrawn Jun 2024
AG1-341 Summer Shade Solar 161 63.6 Hybrid EP Dec 2029

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Summer Shade (EKPC, 1 mention).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Other PJM queue substations in Metcalfe County, KY

All 10 PJM queue filings in Metcalfe County, KY.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first