Magnolia - Summersville substation interconnection queue

1 active project totaling 51 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name Magnolia - Summersville as the point of interconnection, all in Green County, KY.

Target commercial operation dates as filed run from Jan 2026 to May 2030 (2 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: EKPC (1 filing).

1active projects
51active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-1216 Magnolia - Summersville 69 kV 69 51 Solar Active May 2030
AI1-165 Magnolia - Summersville 69 kV 69 50 Hybrid Withdrawn Jan 2026

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Green County, KY