Magnolia - Summersville substation interconnection queue
1 active project totaling 51 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Magnolia - Summersville as the point of interconnection, all in Green County, KY.
Target commercial operation dates as filed run from Jan 2026 to May 2030 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: EKPC (1 filing).
1active projects
51active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1216 | Magnolia - Summersville 69 kV | 69 | 51 | Solar | Active | May 2030 |
| AI1-165 | Magnolia - Summersville 69 kV | 69 | 50 | Hybrid | Withdrawn | Jan 2026 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Green County, KY
- Summer Shade - Green County: 1 active, 36 MW of 2 filed