Magnolia - Summersville substation interconnection queue
1 active project totalling 51 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
51active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1216 | Magnolia - Summersville 69 kV | 69 | 51 | Solar | Active |
| AI1-165 | Magnolia - Summersville 69 kV | 69 | 50 | Hybrid | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.