Substation Scout

Magnolia - Summersville substation interconnection queue

1 active project totalling 51 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
51active MW
2total filed
Queue IDProjectkVMWResourceStatus
C01-1216 Magnolia - Summersville 69 kV 69 51 Solar Active
AI1-165 Magnolia - Summersville 69 kV 69 50 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.