Metcalfe, KY interconnection queue
3 active projects totalling 96.6 MW in the PJM queue, plus 7 with terminal status (shown greyed).
3active projects
96.6active MW
10total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG2-684 | Summer Shade 161 kV | 161 | 198.6 | Solar | Withdrawn |
| AG2-094 | Summer Shade-Green County 161 kV | 161 | 90 | Solar | Withdrawn |
| AG1-341 | Summer Shade Solar | 161 | 63.6 | Hybrid | EP |
| AH1-083 | Summer Shade - Green County 161 kV | 161 | 60 | Solar | Withdrawn |
| AG2-598 | Knob Lick-JB Galloway Tap 69 kV | 69 | 40 | Hybrid | Withdrawn |
| AH1-081 | Knob Lick 69kV | 69 | 36 | Solar | Withdrawn |
| AH1-082 | Knob Lick 69kV | 69 | 26.4 | Solar | Withdrawn |
| AE2-071 | Glover Creek Solar | 69 | 21 | Solar | In Service |
| AI2-327 | Patton Rd-Summer Shade 69 kV | 69 | 19.9 | Solar | Withdrawn |
| AF1-203 | Glover Creek Solar | 69 | 12 | Solar | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.