New Haven Solar (AF2-291) is listed in the PJM interconnection queue as a 60 MW solar project in Mason County, WV. The filing names Sporn South-Leon as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of September 30, 2028.

Queue IDAF2-291
Project nameNew Haven Solar
Status (as published)Engineering and Procurement
SubstationSporn South-Leon
Point of interconnectionSporn South-Leon 138 kV
CountyMason
StateWV
Voltage138 kV
Capacity60 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2028-09-30
Source datasetserial

Same substation and county

Sporn South-Leon substation: 2 requests in the PJM queue, 1 active totaling 60 MW.

Queue IDProjectMWResourceStatus
AI2-304Sporn South-Leon 138 kV36.2SolarWithdrawn

Mason, WV: 11 requests in the PJM queue, 4 active totaling 126 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy100
MW capacity60
MFO100

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.