Rhodes Lane 500 kV
PJM queue ID C01-1267
Rhodes Lane 500 kV (C01-1267) is listed in the PJM interconnection queue as a 28 MW gas project in Westmoreland County, PA. The filing names Rhodes Lane as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 1, 2028.
| Queue ID | C01-1267 |
|---|---|
| Project name | Rhodes Lane 500 kV |
| Status (as published) | Active |
| Substation | Rhodes Lane |
| Point of interconnection | Rhodes Lane 500 kV |
| County | Westmoreland |
| State | PA |
| Voltage | 500 kV |
| Capacity | 28 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2028-12-01 |
| Source dataset | cycle |
Same substation and county
Rhodes Lane substation: 2 requests in the PJM queue, 1 active totaling 28 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| Y2-080 | Rhodes Lane 500kV | 1,065 | Gas | Withdrawn |
Westmoreland, PA: 33 requests in the PJM queue, 7 active totaling 1,292.3 MW.
A substation with the same name is named in PJM transmission planning materials: Rhodes Lane Substation (APS, 4 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Tenaska Pennsylvania Partners, LLC. |
|---|---|
| Transmission owner | APS |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 0.0 |
| MW capacity | 28.0 |
| MFO | 1050.0 |
| Submitted date | 4/27/2026 |
| Last updated | 5/28/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.