Pantago-Five Points substation interconnection queue
1 active project totaling 39 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Pantago-Five Points as the point of interconnection, all in NC.
Target commercial operation dates as filed run from Jun 2021 to Feb 2023 (2 filings).
1active projects
39active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AB2-169 | Wilkinson Solar Energy Center | 115 | 39 | Solar | In Service | Jun 2021 |
| AI2-272 | Pantago-Five Points 115kV | 115 | 32.6 | Solar | Withdrawn | Feb 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Hyde County, NC
No other substation in Hyde County, NC is named as a point of interconnection in the PJM queue.
Other PJM queue substations in Beaufort County, NC
- Wharton: none active of 3 filed
- Pantego-Five Points: none active of 2 filed