Hyde, NC interconnection queue

1 active project totaling 39 MW in the PJM queue, plus 1 with terminal status (shown grayed).

1active projects
39active MW
2total filed
Queue IDProjectkVMWResourceStatus
AB2-169 Wilkinson Solar Energy Center 115 39 Solar In Service
W2-022 Pantego Wind Farm 115 9.6 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.