Substation Scout

Pantego-Five Points substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AD2-094 Pantego-Five Points 115 kV 115 16 Battery Withdrawn
AE1-005 Pantego-Five Points 115 kV 115 16 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.