Beaufort, NC interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 6 with terminal status (shown greyed).

0active projects
0active MW
6total filed
Queue IDProjectkVMWResourceStatus
AC2-108 Wharton 115kV 115 100 Solar Withdrawn
AF2-242 Wharton 115 kV 115 45 Solar Withdrawn
AI2-272 Pantago-Five Points 115kV 115 32.6 Solar Withdrawn
AE1-088 Five Points-Pantego 115 kV 115 20 Battery Withdrawn
AD2-094 Pantego-Five Points 115 kV 115 16 Battery Withdrawn
AE1-005 Pantego-Five Points 115 kV 115 16 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.