Wilkinson Solar Energy Center
PJM queue ID AB2-169
Wilkinson Solar Energy Center (AB2-169) is listed in the PJM interconnection queue as a 39 MW solar project in Hyde County, NC. The filing names Pantago-Five Points as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 30, 2021.
| Queue ID | AB2-169 |
|---|---|
| Project name | Wilkinson Solar Energy Center |
| Status (as published) | In Service |
| Substation | Pantago-Five Points |
| Point of interconnection | Pantago-Five Points 115kV |
| County | Hyde |
| State | NC |
| Voltage | 115 kV |
| Capacity | 39 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2021-06-30 |
| Source dataset | serial |
Same substation and county
Pantago-Five Points substation: 2 requests in the PJM queue, 1 active totaling 39 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AI2-272 | Pantago-Five Points 115kV | 32.6 | Solar | Withdrawn |
Hyde, NC: 2 requests in the PJM queue, 1 active totaling 39 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 74 |
| MW capacity | 39 |
| MFO | 74 |