Wilkinson Solar Energy Center

PJM queue ID AB2-169

Wilkinson Solar Energy Center (AB2-169) is listed in the PJM interconnection queue as a 39 MW solar project in Hyde County, NC. The filing names Pantago-Five Points as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 30, 2021.

Queue IDAB2-169
Project nameWilkinson Solar Energy Center
Status (as published)In Service
SubstationPantago-Five Points
Point of interconnectionPantago-Five Points 115kV
CountyHyde
StateNC
Voltage115 kV
Capacity39 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2021-06-30
Source datasetserial

Same substation and county

Pantago-Five Points substation: 2 requests in the PJM queue, 1 active totaling 39 MW.

Queue IDProjectMWResourceStatus
AI2-272Pantago-Five Points 115kV32.6SolarWithdrawn

Hyde, NC: 2 requests in the PJM queue, 1 active totaling 39 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy74
MW capacity39
MFO74

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.