Wharton substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AC2-108 Wharton 115kV 115 100 Solar Withdrawn
AH2-192 Wharton 138 kV 138 63 Hybrid Withdrawn
AF2-242 Wharton 115 kV 115 45 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.