Wharton substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AC2-108 | Wharton 115kV | 115 | 100 | Solar | Withdrawn |
| AH2-192 | Wharton 138 kV | 138 | 63 | Hybrid | Withdrawn |
| AF2-242 | Wharton 115 kV | 115 | 45 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.