Wharton substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
Target commercial operation dates as filed run from Sep 2019 to Mar 2024 (3 filings).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AC2-108 | Wharton 115kV | 115 | 100 | Solar | Withdrawn | Sep 2019 |
| AH2-192 | Wharton 138 kV | 138 | 63 | Hybrid | Withdrawn | Mar 2024 |
| AF2-242 | Wharton 115 kV | 115 | 45 | Solar | Withdrawn | Sep 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Beaufort County, NC
- Pantago-Five Points: 1 active, 39 MW of 2 filed
- Pantego-Five Points: none active of 2 filed