Substation Scout

Page, VA interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AD1-083 Cape Solar 138 60.1 Solar Withdrawn
AD1-085 North Shenandoah-Stanley 34.5kV 34.5 12.3 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.