Substation Scout

Middleburg substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AG1-244 Middleburg 12.47 kV 12.5 6.5 Solar Withdrawn
AH1-495 Middleburg 12 kV 12 6.4 Solar Withdrawn
AH2-252 Middleburg 12 kV 12 0 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.