Middleburg substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AG1-244 Middleburg 12.47 kV 12.5 6.5 Solar Withdrawn
AH1-495 Middleburg 12 kV 12 6.4 Solar Withdrawn
AH2-252 Middleburg 12 kV 12 0 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.