Snyder, PA interconnection queue
11 active projects totalling 1,462.1 MW in the PJM queue, plus 15 with terminal status (shown greyed).
11active projects
1,462.1active MW
26total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AA2-182 | Sunbury #2 500kV | 500 | 977 | Gas | Withdrawn |
| R04 | Sunbury 500kV | 500 | 817 | Coal | Withdrawn |
| AF1-235 | Sunbury 500 kV | 500 | 617 | Gas | Withdrawn |
| X2-025 | Sunbury Generation Facility | 500 | 416 | Gas | In Service |
| Z1-090 | Sunbury Generation Facility | 500 | 381 | Gas | In Service |
| C01-1852 | Sunbury 69 kV | 69 | 309.6 | Other | Active |
| X4-019 | Sunbury Generation Facility | 500 | 227 | Gas | In Service |
| AE2-288 | Sunbury 500 kV | 500 | 206 | Gas | Withdrawn |
| AA2-171 | Sunbury Generation Facility | 500 | 60 | Gas | In Service |
| AB2-074 | Sunbury #2 500kV | 500 | 50 | Gas | Withdrawn |
| C01-2005 | Sunbury 500 kV | 500 | 50 | Gas | Withdrawn |
| AH1-705 | Sunbury #1 500kV | 500 | 32.4 | Gas | Withdrawn |
| AF2-234 | Washington West Solar | 69 | 24 | Hybrid | Under Construction |
| AH1-471 | Derry Tap- Derry Bus 69 kV VI | 69 | 15 | Solar | Withdrawn |
| AH1-630 | Penns Tap-Richfield Tie 69 kV V | 69 | 15 | Hybrid | Withdrawn |
| AF2-233 | Washington East Solar | 69 | 12 | Hybrid | Under Construction |
| T102 | Sunbury #1 | 69 | 10 | Coal | In Service |
| T103 | Sunbury #1 | 69 | 10 | Coal | In Service |
| AI2-073 | Columbia-Sunbury 69 kV | 69 | 9.9 | Solar | Withdrawn |
| AE1-225 | Sunbury Solar | 69 | 9.4 | Solar | Withdrawn |
| AE2-111 | Thomas Ridge Solar | 69 | 8.4 | Solar | Withdrawn |
| AE2-133 | Penn Solar (Cottontail 6) | 69 | 8.4 | Solar | In Service |
| AG1-244 | Middleburg 12.47 kV | 12.5 | 6.5 | Solar | Withdrawn |
| AH1-495 | Middleburg 12 kV | 12 | 6.4 | Solar | Withdrawn |
| AG2-479 | Penns Tap-Richfield Tie 69 kV II | 69 | 4.1 | Solar | Active |
| AH1-154A | Mount Rock12 kV II | 12 | 3 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.