Substation Scout

Snyder, PA interconnection queue

11 active projects totalling 1,462.1 MW in the PJM queue, plus 15 with terminal status (shown greyed).

11active projects
1,462.1active MW
26total filed
Queue IDProjectkVMWResourceStatus
AA2-182 Sunbury #2 500kV 500 977 Gas Withdrawn
R04 Sunbury 500kV 500 817 Coal Withdrawn
AF1-235 Sunbury 500 kV 500 617 Gas Withdrawn
X2-025 Sunbury Generation Facility 500 416 Gas In Service
Z1-090 Sunbury Generation Facility 500 381 Gas In Service
C01-1852 Sunbury 69 kV 69 309.6 Other Active
X4-019 Sunbury Generation Facility 500 227 Gas In Service
AE2-288 Sunbury 500 kV 500 206 Gas Withdrawn
AA2-171 Sunbury Generation Facility 500 60 Gas In Service
AB2-074 Sunbury #2 500kV 500 50 Gas Withdrawn
C01-2005 Sunbury 500 kV 500 50 Gas Withdrawn
AH1-705 Sunbury #1 500kV 500 32.4 Gas Withdrawn
AF2-234 Washington West Solar 69 24 Hybrid Under Construction
AH1-471 Derry Tap- Derry Bus 69 kV VI 69 15 Solar Withdrawn
AH1-630 Penns Tap-Richfield Tie 69 kV V 69 15 Hybrid Withdrawn
AF2-233 Washington East Solar 69 12 Hybrid Under Construction
T102 Sunbury #1 69 10 Coal In Service
T103 Sunbury #1 69 10 Coal In Service
AI2-073 Columbia-Sunbury 69 kV 69 9.9 Solar Withdrawn
AE1-225 Sunbury Solar 69 9.4 Solar Withdrawn
AE2-111 Thomas Ridge Solar 69 8.4 Solar Withdrawn
AE2-133 Penn Solar (Cottontail 6) 69 8.4 Solar In Service
AG1-244 Middleburg 12.47 kV 12.5 6.5 Solar Withdrawn
AH1-495 Middleburg 12 kV 12 6.4 Solar Withdrawn
AG2-479 Penns Tap-Richfield Tie 69 kV II 69 4.1 Solar Active
AH1-154A Mount Rock12 kV II 12 3 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.