Substation Scout

Sunbury #1 substation interconnection queue

1 active project totalling 60 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
60active MW
2total filed
Queue IDProjectkVMWResourceStatus
AA2-171 Sunbury Generation Facility 500 60 Gas In Service
AH1-705 Sunbury #1 500kV 500 32.4 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.