Columbia-Sunbury substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Columbia-Sunbury as the point of interconnection, all in Snyder County, PA.
Target commercial operation dates as filed run from Jun 2024 to Jun 2027 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AI2-073 | Columbia-Sunbury 69 kV | 69 | 9.9 | Solar | Withdrawn | Jun 2024 |
| AE1-225 | Sunbury Solar | 69 | 9.4 | Solar | Withdrawn | Jun 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Snyder County, PA
- Sunbury: 5 active, 1,044 MW of 10 filed
- Sunbury #1: 1 active, 60 MW of 2 filed
- Penns-Richfield Tie #1: 2 active, 36 MW of 2 filed
- Middleburg: none active of 3 filed
- Sunbury #2: none active of 2 filed
Site Scanner