Meadow Brook substation interconnection queue
1 active project totalling 70 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
70active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG2-300 | Meadow Brook 138 kV | 138 | 70 | Battery | Active |
| U2-088 | Meadow Brook 500kV | 500 | 0 | Not reported | Withdrawn |
| U3-005 | Meadow Brook | n/r | 0 | Not reported | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.