Meadow Brook substation interconnection queue

1 active project totalling 70 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
70active MW
3total filed
Queue IDProjectkVMWResourceStatus
AG2-300 Meadow Brook 138 kV 138 70 Battery Active
U2-088 Meadow Brook 500kV 500 0 Not reported Withdrawn
U3-005 Meadow Brook n/r 0 Not reported Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.