Substation Scout

Frederick, VA interconnection queue

12 active projects totalling 748.5 MW in the PJM queue, plus 11 with terminal status (shown greyed).

12active projects
748.5active MW
23total filed
Queue IDProjectkVMWResourceStatus
AG2-288 Stonewall 138 kV 138 150 Battery Active
C01-1753 Woodside 500 kV 500 150 Battery Active
AG2-182 Doubs-Bismark 500 kV 500 133.3 Solar Active
AI1-184 Greenwood 138 kV 138 110 Battery Withdrawn
C01-2084 Greenwood 138 kV 138 110 Battery Active
W3-027 Meadowbrook 500kV 500 100 Not reported Withdrawn
AG2-300 Meadow Brook 138 kV 138 70 Battery Active
AH1-119 Bismark-Doubs 500 kV 500 66.7 Hybrid Withdrawn
C01-2217 Long Creek 138 kV 138 47 Solar Withdrawn
AG2-584 Double Toll Gate - Meadowbrook 138 kV 138 46.8 Hybrid Withdrawn
AE2-230 Bartonsville Energy Facility 138 42 Solar In Service
AD1-155 Foxglove Solar 138 37.2 Solar In Service
AF2-075 Bartonsville Energy Facility 138 30 Solar In Service
AH1-001 Bartonsville-Meadowbrook 138 kV 138 30 Solar Withdrawn
AG2-349 Double Toll Gate-Mead Brook 138 kV 138 28.7 Solar Withdrawn
AG1-533 Bartonsville Energy Facility 138 24 Solar Withdrawn
AG1-045 Redbud-Gaylord 34.5 kV 34.5 18 Solar Suspended
AH1-132 Double Toll Gate - Strasburg 34.5 kV 34.5 14.4 Gas Withdrawn
AG2-056 Gore 138 kV 138 13.2 Solar Withdrawn
AF1-291A Bartonsville Energy Facility 138 6 Solar In Service
U1-044 Fredrick County Regional LF n/r 2 Gas In Service
AG1-012 Foxglove Solar Storage Uprate 138 0 Hybrid Withdrawn
U2-028 Meadow Brook Capacitor n/r 0 Not reported In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.