Bartonsville-Meadow Brook substation interconnection queue

2 active projects totalling 48 MW in the PJM queue.

2active projects
48active MW
2total filed
Queue IDProjectkVMWResourceStatus
AE2-230 Bartonsville Energy Facility 138 42 Solar In Service
AF1-291A Bartonsville Energy Facility 138 6 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.