Greenwood substation interconnection queue
1 active project totalling 110 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
110active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI1-184 | Greenwood 138 kV | 138 | 110 | Battery | Withdrawn |
| C01-2084 | Greenwood 138 kV | 138 | 110 | Battery | Active |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.