Greenwood substation interconnection queue

1 active project totaling 110 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name Greenwood as the point of interconnection, all in Frederick County, VA.

Target commercial operation dates as filed run from Dec 2027 to Apr 2031 (2 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: APS (1 filing).

1active projects
110active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AI1-184 Greenwood 138 kV 138 110 Battery Withdrawn Dec 2027
C01-2084 Greenwood 138 kV 138 110 Battery Active Apr 2031

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Greenwood (APS, 6 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Other PJM queue substations in Frederick County, VA

All 23 PJM queue filings in Frederick County, VA.