Clinton Solar (AD2-031) is listed in the PJM interconnection queue as a 19 MW solar project in Clinton County, OH. The filing names Martinsville-Wilmington as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 25, 2025.
| Queue ID | AD2-031 |
|---|---|
| Project name | Clinton Solar |
| Status (as published) | In Service |
| Substation | Martinsville-Wilmington |
| Point of interconnection | Martinsville-Wilmington 69 kV |
| County | Clinton |
| State | OH |
| Voltage | 69 kV |
| Capacity | 19 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2025-06-25 |
| Source dataset | serial |
Same substation and county
Martinsville-Wilmington substation: 3 requests in the PJM queue, 2 active totaling 29.9 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AF1-159 | Clinton Solar | 10.9 | Solar | In Service |
| AD1-147 | Martinsville-Wilmington 69 kV | 30 | Solar | Withdrawn |
Clinton, OH: 11 requests in the PJM queue, 6 active totaling 281.9 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 49.9 |
| MW capacity | 19 |
| MFO | 49.9 |