Substation Scout

Clinton Solar

PJM queue ID AD2-031

Clinton Solar (AD2-031) is listed in the PJM interconnection queue as a 19 MW solar project in Clinton County, OH. The filing names Martinsville-Wilmington as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 25, 2025.

Queue IDAD2-031
Project nameClinton Solar
Status (as published)In Service
SubstationMartinsville-Wilmington
Point of interconnectionMartinsville-Wilmington 69 kV
CountyClinton
StateOH
Voltage69 kV
Capacity19 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2025-06-25
Source datasetserial

Same substation and county

Martinsville-Wilmington substation: 3 requests in the PJM queue, 2 active totaling 29.9 MW.

Queue IDProjectMWResourceStatus
AF1-159Clinton Solar10.9SolarIn Service
AD1-147Martinsville-Wilmington 69 kV30SolarWithdrawn

Clinton, OH: 11 requests in the PJM queue, 6 active totaling 281.9 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy49.9
MW capacity19
MFO49.9

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first