Bellflower Solar 1
PJM queue ID AE2-297
Bellflower Solar 1 (AE2-297) is listed in the PJM interconnection queue as a 91.5 MW solar project in Henry County, IN. The filing names Madison-Tanners Creek as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2024.
| Queue ID | AE2-297 |
|---|---|
| Project name | Bellflower Solar 1 |
| Status (as published) | In Service |
| Substation | Madison-Tanners Creek |
| Point of interconnection | Madison-Tanners Creek 138 kV |
| County | Henry |
| State | IN |
| Voltage | 138 kV |
| Capacity | 91.5 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2024-12-31 |
| Source dataset | serial |
Same substation and county
Madison-Tanners Creek substation: 5 requests in the PJM queue, 1 active totaling 91.5 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AA2-148 | Madison-Tanners Creek 138kV | 22.8 | Wind | Withdrawn |
| AB2-065 | Madison-Tanners Creek 138kV | 16 | Wind | Withdrawn |
| W4-004 | Flat Rock-WF-1 | 11.7 | Wind | Withdrawn |
| W4-008 | Flat Rock - WF-1 | 11.7 | Wind | Withdrawn |
Henry, IN: 8 requests in the PJM queue, 2 active totaling 102.1 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 152.5 |
| MW capacity | 91.5 |
| MFO | 152.5 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.