Norge Solar

PJM queue ID AG1-145

Norge Solar (AG1-145) is listed in the PJM interconnection queue as a 12 MW solar project in James City, VA. The filing names Lightfoot as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of October 1, 2023.

Queue IDAG1-145
Project nameNorge Solar
Status (as published)In Service
SubstationLightfoot
Point of interconnectionLightfoot 34.5 kV
CountyJames City
StateVA
Voltage34.5 kV
Capacity12 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2023-10-01
Source datasetserial

Same substation and county

Lightfoot substation: 2 requests in the PJM queue, 1 active totaling 12 MW.

Queue IDProjectMWResourceStatus
AG1-032Lightfoot 34.5 kV12SolarWithdrawn

James City, VA: 8 requests in the PJM queue, 3 active totaling 675.3 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy20
MW capacity12
MFO20

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.