Lemoyne substation interconnection queue
4 active projects totalling 771.4 MW in the PJM queue, plus 4 with terminal status (shown greyed).
4active projects
771.4active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE1-119 | Lemoyne 345 kV | 345 | 550 | Hybrid | Withdrawn |
| C01-1759 | Lemoyne 345 kV | 345 | 378.9 | Gas | Active |
| AH1-711 | Lemoyne 345 kV | 345 | 292.5 | Gas | Active |
| AH1-565 | Troy Battery Storage | 345 | 250 | Battery | Withdrawn |
| AD1-118 | Troy Energy | n/r | 60 | Gas | In Service |
| W1-072A_AT5 | Troy Energy | n/r | 40 | Gas | In Service |
| Y2-053 | Lemoyne 138kV | 138 | 35 | Gas | Withdrawn |
| AH1-425 | Lemoyne 138kV | 138 | 19.2 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.