Substation Scout

Lemoyne substation interconnection queue

4 active projects totaling 771.4 MW in the PJM queue, plus 4 with terminal status (shown grayed).

8 PJM queue filings name Lemoyne as the point of interconnection, all in OH.

Target commercial operation dates as filed run from Jun 2011 to May 2031 (8 filings). 2 active filings target a date after November 27, 2026.

Transmission owner as filed: ATSI (3 filings).

4active projects
771.4active MW
8total filed
Queue IDProjectkVMWResourceStatusTarget COD
AE1-119 Lemoyne 345 kV 345 550 Hybrid Withdrawn Jun 2022
C01-1759 Lemoyne 345 kV 345 378.9 Gas Active May 2031
AH1-711 Lemoyne 345 kV 345 292.5 Gas Active May 2030
AH1-565 Troy Battery Storage 345 250 Battery Withdrawn Jun 2025
AD1-118 Troy Energy n/r 60 Gas In Service Aug 2022
W1-072A_AT5 Troy Energy n/r 40 Gas In Service Jun 2011
Y2-053 Lemoyne 138kV 138 35 Gas Withdrawn Jun 2016
AH1-425 Lemoyne 138kV 138 19.2 Solar Withdrawn Jul 2024

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Lemoyne (ATSI, 11 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Other PJM queue substations in Wood County, OH

All 19 PJM queue filings in Wood County, OH.

Other PJM queue substations in Ottawa County, OH

No other substation in Ottawa County, OH is named as a point of interconnection in the PJM queue.

All 2 PJM queue filings in Ottawa County, OH.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first