Wood, OH interconnection queue
8 active projects totalling 1,818.7 MW in the PJM queue, plus 11 with terminal status (shown greyed).
8active projects
1,818.7active MW
19total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1968 | Fostoria - Lemoyne 345 kV & Fostoria - Lallendorf 345 kV | 345 | 931.1 | Gas | Active |
| AE1-119 | Lemoyne 345 kV | 345 | 550 | Hybrid | Withdrawn |
| C01-1759 | Lemoyne 345 kV | 345 | 378.9 | Gas | Active |
| AH1-711 | Lemoyne 345 kV | 345 | 292.5 | Gas | Active |
| AH1-565 | Troy Battery Storage | 345 | 250 | Battery | Withdrawn |
| AG2-470 | Fostoria - Lemoyne 345 kV | 345 | 180 | Solar | Withdrawn |
| C01-1451 | Woodville - WEST END FOSTORIA 138 kV | 138 | 74.8 | Solar | Active |
| AI2-164 | Fostoria Central - Lemoyn 345 kV | 345 | 72 | Solar | Withdrawn |
| AD1-118 | Troy Energy | n/r | 60 | Gas | In Service |
| AH2-068 | Pemberville - West End Fostoria 69 kV | 69 | 60 | Solar | Withdrawn |
| W1-072A_AT5 | Troy Energy | n/r | 40 | Gas | In Service |
| Y2-053 | Lemoyne 138kV | 138 | 35 | Gas | Withdrawn |
| AF1-064 | Juliet Energy | 69 | 33.4 | Solar | Partially in Service - Under Construction |
| AH2-408 | Fostoria - Lemoyne 138 kV | 138 | 29.9 | Hybrid | Withdrawn |
| AG2-195 | Dowling 138 kV | 138 | 22.3 | Solar | Withdrawn |
| AH2-409 | Fostoria - Lemoyne 138 kV II | 138 | 18.1 | Hybrid | Withdrawn |
| AH1-122 | Dowling 138 kV II | 138 | 9.2 | Solar | Withdrawn |
| AF2-126 | Juliet Energy | 69 | 8 | Solar | UC-ISP |
| Y2-092 | Walbridge Solar | n/r | 0 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.