Substation Scout

Wood, OH interconnection queue

8 active projects totalling 1,818.7 MW in the PJM queue, plus 11 with terminal status (shown greyed).

8active projects
1,818.7active MW
19total filed
Queue IDProjectkVMWResourceStatus
C01-1968 Fostoria - Lemoyne 345 kV & Fostoria - Lallendorf 345 kV 345 931.1 Gas Active
AE1-119 Lemoyne 345 kV 345 550 Hybrid Withdrawn
C01-1759 Lemoyne 345 kV 345 378.9 Gas Active
AH1-711 Lemoyne 345 kV 345 292.5 Gas Active
AH1-565 Troy Battery Storage 345 250 Battery Withdrawn
AG2-470 Fostoria - Lemoyne 345 kV 345 180 Solar Withdrawn
C01-1451 Woodville - WEST END FOSTORIA 138 kV 138 74.8 Solar Active
AI2-164 Fostoria Central - Lemoyn 345 kV 345 72 Solar Withdrawn
AD1-118 Troy Energy n/r 60 Gas In Service
AH2-068 Pemberville - West End Fostoria 69 kV 69 60 Solar Withdrawn
W1-072A_AT5 Troy Energy n/r 40 Gas In Service
Y2-053 Lemoyne 138kV 138 35 Gas Withdrawn
AF1-064 Juliet Energy 69 33.4 Solar Partially in Service - Under Construction
AH2-408 Fostoria - Lemoyne 138 kV 138 29.9 Hybrid Withdrawn
AG2-195 Dowling 138 kV 138 22.3 Solar Withdrawn
AH2-409 Fostoria - Lemoyne 138 kV II 138 18.1 Hybrid Withdrawn
AH1-122 Dowling 138 kV II 138 9.2 Solar Withdrawn
AF2-126 Juliet Energy 69 8 Solar UC-ISP
Y2-092 Walbridge Solar n/r 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.