Ottawa, OH interconnection queue

1 active project totalling 80 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
80active MW
2total filed
Queue IDProjectkVMWResourceStatus
C01-1506 Davis Besse 345 kV 345 80 Nuclear Active
AH1-425 Lemoyne 138kV 138 19.2 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.