Ottawa, OH interconnection queue
1 active project totalling 80 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
80active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1506 | Davis Besse 345 kV | 345 | 80 | Nuclear | Active |
| AH1-425 | Lemoyne 138kV | 138 | 19.2 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.