Troy Energy
PJM queue ID W1-072A_AT5
Troy Energy (W1-072A_AT5) is listed in the PJM interconnection queue as a 40 MW gas project in Wood County, OH. The filing names Lemoyne as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 1, 2011.
| Queue ID | W1-072A_AT5 |
|---|---|
| Project name | Troy Energy |
| Status (as published) | In Service |
| Substation | Lemoyne |
| Point of interconnection | Lemoyne |
| County | Wood |
| State | OH |
| Voltage | Not reported |
| Capacity | 40 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2011-06-01 |
| Source dataset | serial |
Same substation and county
Lemoyne substation: 8 requests in the PJM queue, 4 active totaling 771.4 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1759 | Lemoyne 345 kV | 378.9 | Gas | Active |
| AH1-711 | Lemoyne 345 kV | 292.5 | Gas | Active |
| AD1-118 | Troy Energy | 60 | Gas | In Service |
| AE1-119 | Lemoyne 345 kV | 550 | Hybrid | Withdrawn |
| AH1-565 | Troy Battery Storage | 250 | Battery | Withdrawn |
| Y2-053 | Lemoyne 138kV | 35 | Gas | Withdrawn |
| AH1-425 | Lemoyne 138kV | 19.2 | Solar | Withdrawn |
Wood, OH: 19 requests in the PJM queue, 7 active totaling 887.6 MW.
A substation with the same name is named in PJM transmission planning materials: Lemoyne (ATSI, 11 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 40 |
| MW capacity | 40 |
| MFO | 640 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.