Substation Scout

Lemoyne 345 kV

PJM queue ID AH1-711

Lemoyne 345 kV (AH1-711) is listed in the PJM interconnection queue as a 292.5 MW gas project in Wood County, OH. The filing names Lemoyne as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of May 31, 2030.

Queue IDAH1-711
Project nameLemoyne 345 kV
Status (as published)Active
SubstationLemoyne
Point of interconnectionLemoyne 345 kV
CountyWood
StateOH
Voltage345 kV
Capacity292.5 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2030-05-31
Source datasetcycle

Same substation and county

Lemoyne substation: 8 requests in the PJM queue, 4 active totaling 771.4 MW.

Queue IDProjectMWResourceStatus
C01-1759Lemoyne 345 kV378.9GasActive
AD1-118Troy Energy60GasIn Service
W1-072A_AT5Troy Energy40GasIn Service
AE1-119Lemoyne 345 kV550HybridWithdrawn
AH1-565Troy Battery Storage250BatteryWithdrawn
Y2-053Lemoyne 138kV35GasWithdrawn
AH1-425Lemoyne 138kV19.2SolarWithdrawn

Wood, OH: 19 requests in the PJM queue, 7 active totaling 887.6 MW.

A substation with the same name is named in PJM transmission planning materials: Lemoyne (ATSI, 11 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperTroy Energy, LLC
Transmission ownerATSI
Project typeGeneration Interconnection
CycleTC2
StagePhase 3
MW energy408.2
MW capacity292.5
MFO1108.2
Submitted date4/9/2025
Last updated9/1/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.