Kincaid-Pana substation interconnection queue
5 active projects totaling 360.9 MW in the PJM queue, plus 4 with terminal status (shown grayed).
9 PJM queue filings name Kincaid-Pana as the point of interconnection, all in Christian County, IL.
Target commercial operation dates as filed run from Sep 2022 to Dec 2030 (9 filings). 5 active filings target a date after November 27, 2026.
Transmission owner as filed: ComEd (4 filings).
5active projects
360.9active MW
9total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AE2-261 | Black Diamond Solar | 345 | 179.4 | Solar | EP | Dec 2030 |
| AD2-100 | Broomstick Solar Energy Center | 345 | 126 | Solar | Suspended | Dec 2028 |
| AI2-133 | Kincaid-Pana 345kV | 345 | 84.1 | Solar | Withdrawn | Oct 2026 |
| AE1-242 | Kincaid-Pana | n/r | 63 | Solar | Withdrawn | Dec 2022 |
| AF1-252 | Kincaid-Pana | n/r | 62.4 | Battery | Withdrawn | Sep 2022 |
| AF1-253 | Kincaid-Pana | n/r | 43.2 | Battery | Withdrawn | Sep 2022 |
| AF1-090 | Rolling Farms Wind Project | n/r | 35.2 | Wind | Engineering and Procurement | Dec 2029 |
| AG1-460 | Black Diamond Solar | 345 | 12 | Battery | EP | Dec 2030 |
| AD2-131 | Broomstick Solar Energy Center | 345 | 8.3 | Solar | Suspended | Dec 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Christian County, IL
- TSS 903 Tovey: 2 active, 518 MW of 2 filed
- Kincaid: none active of 4 filed