Substation Scout

Black Diamond Solar

PJM queue ID AE2-261

Black Diamond Solar (AE2-261) is listed in the PJM interconnection queue as a 179.4 MW solar project in Christian County, IL. The filing names Kincaid-Pana as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of December 15, 2030.

Queue IDAE2-261
Project nameBlack Diamond Solar
Status (as published)EP
SubstationKincaid-Pana
Point of interconnectionKincaid-Pana 345 kV
CountyChristian
StateIL
Voltage345 kV
Capacity179.4 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2030-12-15
Source datasetcycle

Same substation and county

Kincaid-Pana substation: 9 requests in the PJM queue, 5 active totaling 360.9 MW.

Queue IDProjectMWResourceStatus
AD2-100Broomstick Solar Energy Center126SolarSuspended
AF1-090Rolling Farms Wind Project35.2WindEngineering and Procurement
AG1-460Black Diamond Solar12BatteryEP
AD2-131Broomstick Solar Energy Center8.3SolarSuspended
AI2-133Kincaid-Pana 345kV84.1SolarWithdrawn
AE1-242Kincaid-Pana63SolarWithdrawn
AF1-252Kincaid-Pana62.4BatteryWithdrawn
AF1-253Kincaid-Pana43.2BatteryWithdrawn

Christian, IL: 18 requests in the PJM queue, 8 active totaling 1,125.9 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperBlack Diamond Solar Power, LLC
Transmission ownerComEd
Project typeGeneration Interconnection
CycleTC1
StageFINAL AGREEMENT
MW energy299.0
MW capacity179.4
MFO299.0
Submitted date3/28/2019
Last updated2/6/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first